Ibn Sina Petrochemical Project

Ibn Sina PetrochemicalDuration: 2021–2024 (36 months)

Client: Ibn Sina Petrochemical Company
Duration: 2019–2021 (24 months)

About the Project

In 2019, Thamin Group signed a contract for the construction and installation of steel structures, the installation of mechanical equipment and compressors, and the execution of civil and piping operations for the Ibn Sina Petrochemical Complex.
The project showcased Thamin Group’s technical capabilities in delivering complex industrial facilities on time and to the highest engineering standards. The construction and commissioning phases successfully continued until early 2021.

About Us

Founded in 1999, Thamin Group is a leading Iranian industrial and engineering company specializing in the design, fabrication, and installation of industrial structures, petrochemical equipment, and steel projects. With decades of technical expertise, Thamin delivers reliable solutions across automotive, energy, and infrastructure sectors.